{"id":281,"date":"2023-11-30T09:34:08","date_gmt":"2023-11-30T09:34:08","guid":{"rendered":"https:\/\/tenderbulletin.org\/?p=281"},"modified":"2023-11-30T09:34:08","modified_gmt":"2023-11-30T09:34:08","slug":"the-design-manufacture-testing-and-supply-of-line-hardware-on-an-as-and-when-required-basis-for-a-period-of-5-five-years-for-transmission-division","status":"publish","type":"post","link":"https:\/\/tenderbulletin.org\/the-design-manufacture-testing-and-supply-of-line-hardware-on-an-as-and-when-required-basis-for-a-period-of-5-five-years-for-transmission-division\/","title":{"rendered":"THE DESIGN, MANUFACTURE, TESTING AND SUPPLY OF LINE HARDWARE ON AN AS AND WHEN REQUIRED BASIS FOR A PERIOD OF 5 (FIVE) YEARS FOR TRANSMISSION DIVISION"},"content":{"rendered":"
\n